While the Extruder is the heart of the Spiroll Hollow
Core System, additional equipment is essential to
transport the concrete mix from the batching plant
to the Extruder.
Delivery of the concrete must be carefully thought
out so that the Extruder doesn't run out of mix and
slow down production. Several methods of concrete
delivery can be used such as overhead cranes, fork
lifts etc., however the best method is the Concrete
Distribution System (CDS).
The CDS is a smart crane concept which was designed
10 years ago. It is a modular design based on standard
crane components that allows great freedom in lifting
capacities and speeds.
This System uses a self-propelled Skip to receive
concrete from the batching plant and deliver it into
the Extruder hopper.
Operation
1. The CDS is operated by a touch screen, which is
mounted at ground level. The operator selects the
type of hollowcore that is to be produced.
2. The operator switches to auto mode (on the radio
remote unit) and the crane will automatically lift
the skip and travel towards the filling station.
3. The hoisting unit automatically lowers the skip
into the filling station and waits for the signal
that skip has been filled.
4. After the signal the skip will be automatically
lifted and the crane and crab move toward the Extruder.
5. As the crane and crab reach the Extruder the skip
will automatically lower to the required level.
6. The operator must switch to manual operation and
fill the casting machine by the remote control.
7. After the skip has been emptied the operator starts
the automatic sequence again.
Features
• Modular Design - flexible lifting capacities
and speed of operation.
• Ease of Service - are standard parts available
worldwide.
• All movements controlled by inverters - reducing
wear on brakes, ropes and mechanical parts.
• Touch-screen - operator can easily select the
required program for automatic operations.
• Bucket can be lowered to ground level
• The hoisting-unit has a high safety level;
the skip hangs in 4 separate ropes.
• Guiding system that stops the skip hitting
the beams
Advantages
• The CDS will cut labour costs
• The CDS will increase production capacity
• Skip can be placed on an existing crane track
• No additional crane track for a bullet bucket
is necessary
• The system is easy to program
• The system is easy to maintain
• The Skip is easy to clean on floor level
• The CDS doesn't interfere with other machinery
on the ground
• The CDS can be ultilised to lift Production
Machinery
• Working with this system will improve the
safety in the plant
Specifications
The standard electrically operated Automatic Concrete
Distribution System is designed according to the following
specifications: -
• Lifting capacity : max. 2m³ of concrete
• Span : ± 15m
• Bucket Hoisting speed : 0-10 m per min.
• Crab traveling speed : 0-31.5 m per min.
• Crane traveling speed : 0-100 m per min.
• Lifting height : max. 6.5m
• Skip capacity : 2m³ of concrete
Optional Extras
• An extra hoisting unit can be provided to
adapt the system to lift the Extruder & other
production equipment.
• Two extra hoisting units can also be provided
to use the crane to lift the hollowcore slabs.
• The crane can be installed with a modem, so
that software can be serviced and changed online.
• If there are two or more cranes on the track
an anti-collision system can be installed.
• The system can be equipped with an anti-sway
option.
• Depending on the existing facilities a filling
station can be provided & installed.
If you have an existing factory and looking at the
feasibility of adding the CDS to it then please ensure
you also include the following details: -
• Drawings of the layout of your production
plant
• Location of the Batching Plant
• Number of the Casting Beds
• Length of the Casting Beds
• Details on existing overhead cranes
• Available Headroom
If you would be interested in receiving more information
regarding the Concrete Distribution System or a quotation
then please contact us on the email link below.
|